Skip to content
VeraKitchen · Bath · Closets
Kitchen Remodeling page banner

Kitchen Remodeling · Austin

Kitchen remodeling in Austin

The whole room, not just the cabinets. We measure, design, remove the old kitchen and install the new one with our own crew.

  • One crew, start to finish
  • Austin, since 2022
  • One company accountable

What’s involved

What a kitchen remodel includes with us

Layout and storage

We start with how you use the room — where things live, what you reach for daily, what never gets used.

Cabinetry and countertops

Cabinets, countertops and the hardware that goes on them, specified together so they fit properly.

The install

Our crew removes the old kitchen and fits the new one. Same people, start to finish.

The finishing details

Backsplash, lighting and the trim work that separates a finished room from an almost-finished one.

No surprises

What’s included, and what isn’t

Being clear about the second half prevents the awkward conversation later.

  • Free in-home measurement
  • Design of the layout with youBefore anything is ordered
  • Removal and disposal of the old kitchen
  • Cabinetry and installation
  • Countertops
  • Cabinet hardware
  • Clean-up at the end of each working day
  • Moving gas, plumbing or electrical linesWe will tell you if your layout needs it
  • Structural work or removing walls
  • Appliances
  • Flooring beyond the kitchen footprint

Included, at no charge

Start with a free measurement and a real design

Free measurement

We come to you, measure the room properly and take the guesswork out of the plan. There is no charge and no obligation to go ahead.

Professional design

You sit with a designer and see your room laid out before anything is ordered — layout, storage and finishes together.

How it works

How it works

Four steps, and you always know what happens next.

  1. 01About an hour

    Visit the showroom

    We listen to what is not working in the room today and show you what the options actually look like.

    You: Bring photos of your room and anything you have saved that you like.

  2. 02One visit

    We measure your room

    We come to your home, measure properly and check what is behind the walls before anything is designed.

    You: Be home, and tell us about anything unusual you already know about.

  3. 03A week or so

    You see the design

    We lay the room out, choose finishes with you and agree exactly what is included before you commit.

    You: Tell us what you would change. It is easier to change now than later.

  4. 04Agreed before we start

    We build and install

    Our own crew removes the old room and installs the new one, and cleans up at the end of each day.

    You: Clear the room, and let us know the best times to come and go.

Kitchens are the longest of the three rooms and the one you notice most while it is happening, so we agree the working days with you before we start.

Living through it

What to expect while we work

A straightforward replacement in the same layout

The shortest of our projects

Out of action: The kitchen, including the sink

We set up a temporary spot for the kettle and microwave, and tell you the day before the water goes off.

A changed layout

Longer, because the order of work changes

Out of action: The kitchen, and sometimes the adjoining room

We sequence the trades so you are not living around an empty room waiting.

Before you ask

Kitchen questions

Do I need an appointment to visit the showroom?+

No. You are welcome to walk in any time we are open, and someone will show you around.

Booking a time means someone is set aside to sit with you properly, which is usually the better first visit if you already have a room in mind.

Do you do the installation yourselves?+

Yes. The same company measures, designs, removes the old room and installs the new one. There is no subcontractor chain to chase if something needs putting right.

What areas do you serve?+

We work throughout Austin and the surrounding area. Ask us if you are not sure whether you are in range.

Is the measurement really free?+

Yes. We come to you, measure the room properly and talk through what is possible. There is no charge for that visit and no obligation to go ahead.

What should I bring to my appointment?+

Photos of the room as it is now are the most useful thing. Rough measurements help too, and anything you have saved that you like — it tells us more than a description can.

What happens to my kitchen while you work?+

The room is out of use while we are in it, including the sink. We tell you in advance which days that applies to, and we clean up at the end of each working day.

See the finishes in person

2112 Rutland Dr #150, Austin, TX 78758 · walk-ins welcome

Schedule an Appointment

Free, and genuinely free

Come and see it for yourself

Book a time at our Austin showroom and walk through the finishes with someone who builds these rooms every week.

Or call us — we answer the phone.

CallSchedule an Appointment